GROUND PROTECTION & TEMPORARY ACCESS Β· UK HIRE

UK specialists in
ground protection
and trackway hire.

Temporary access for vehicles, plant and people. Tell us about your site, or use TrackSpec for an indicative starting point.

THE HIRE RANGE

Find your starting point.
We confirm the fit.

Compare panel sizes, weight, connections and published load guidance. We confirm the right system against your ground, traffic and layout.

TM10 recycled rubber ground protection panels
TM10 Light Duty
Light duty

TM10 Β· Walkways & event flooring

Recycled rubber panels for pedestrian routes, marquees and event spaces.

Panel size
1.2 Γ— 0.8 m22 mm thick Β· 0.96 mΒ² per mat
Panel weight
20 kg
Connection
Tongue & grooveNo bolts or loose joiners
Supplier guidance
Up to 10t suggestedGround and application assessed before vehicle use
Hand installationView product
TM10 event flooring installed at a horse trials siteCASE STUDYSee TM10 at the horse trials
TM50 HDPE ground protection mat
TM50 Medium Duty
Medium duty

TM50 Β· Vehicle access & compounds

HDPE mats for temporary vehicle routes, parking and event access.

Panel size
2.41 Γ— 1.2 m20 mm total thickness Β· 2.89 mΒ² per mat
Panel weight
36 kgCurrent Isokon specification
Connection
2-way & 4-way joiners
Supplier guidance
Up to 20t softer ground; over 50t firm groundGround dependent; project review required
Two-person installationView product
TrackMatz route control beside a completed TM50 temporary event routeCASE STUDYSee a 200m TM50 event route
TM120 recycled HDPE heavy-duty roadway panel
TM120 Heavy Duty
Heavy duty

TM120 Β· Heavy vehicle trackway

Roadway panels for assessed vehicle movements, compounds and site access.

Panel size
3 Γ— 2.5 m40 mm thick Β· 7.5 mΒ² per panel
Panel weight
295 kg
Connection
Metal straps & M16 bolts
Supplier guidance
Loads to 60t; vehicles to 100tSubject to panel configuration and ground conditions
Plant installationView product
Aircraft move completed over TM120 ground protection matsCASE STUDYSee TM120 at the RAF Museum
MegaDeck HD+ orange composite mat with MDX connection openings
TM200 MegaDeck HD+
Extra heavy duty

TM200 Β· Heavy plant access

Composite panels for demanding access projects, with loading and ground support reviewed.

Panel size
Approx. 4.3 Γ— 2.3 m101.6 mm total thickness Β· 7.85 mΒ² usable
Panel weight
Approx. 465 kg
Connection
MDX locking pinsSee how the MDX connection works
Supplier guidance
Project-assessed loadingGround dependent; project review required
Plant installationView product
MegaDeck HD+ installed at a transmission site in the Netherlands, supplier exampleAPPLICATION GUIDEExplore TM200 applications
Hiring for a project, or buying for repeated use?

Consider the programme, future use, storage and handling. We can work through both options with you.

Explore mats for sale β†—Discuss hire or purchase β†—
FROM FIRST BRIEF TO FINAL LIFT

The route on paper.
The plan on site.

Ground evidence, layout drawings, project-specific RAMS and installation planning come together around the agreed scope.

Illustrative aerial view of TrackMatz delivery vehicles, installation plant and ground protection mats
Delivery and installation
  1. 01

    Brief & review

    Share your site, traffic, dates and ground information. We identify the details needed to plan the access.

  2. 02

    Drawings & RAMS

    Agree the layout, delivery approach and installation method, with project-specific documents for the work.

  3. 03

    Deliver & install

    Coordinate the access, plant, installation team and agreed delivery windows.

  4. 04

    Recover & inspect

    Plan the uplift and return, with mats counted, checked and prepared for their next project.

Explore delivery and installation planning β†—
TrackMatz project ground photo showing the route and surface conditions Real project ground evidence
SEND THE PROJECT BRIEF

Show us the site.
Let’s plan the access.

Send the details you have: the site, the work, the traffic and the dates. Add photographs or a drawing if available. We’ll work through what is needed next.

  • GroundPhotos, surface and recent weather
  • RouteLength, width, turns and transitions
  • TrafficVehicles, plant, frequency and loads
  • ProgrammeDates, duration and access windows